 Site ClearingRemoving all trees and bushes |  Site ExcavationExcavating for new footing |  Foundation Wall PrepInstalling rebar and laying out penetrations |
---|
 Slab Prep with 2" Insulation2" Rigid insulation below new concrete slab |  Framing with ElectricalTJI framing and electrical rough-in |  Mastic at all Duct JointsAll duct joints are sealed with mastic |
---|
 Ductwork & SprinklersNew duct-work, plumbing and sprinkler layout. |  Plywood Seams TapedAir seal plywood joints with tape |  Insulation at WindowsInsulation between framing and window to reduce thermal bridging |
---|
 Window InstallationTape seal window exterior to reduce air leakage |  Blown in Cellulose InsulationInsulating all exterior walls and ridge beams |  Finishing DrywallCrew tape and mud all drywall seams |
---|
 Exterior Insulation2" of exterior rigid insulation |  Siding InstallationCrew installing hardi-board siding |  Rear Elevation During ConstructionView of siding installation in progress |
---|
 Testing of Bathroom FansConsultant checking the efficiency of bath fan |  Blower Door TestingConsulting checking the buildings' volume of air leakage |  Completed BedroomView of completed bedroom |
---|
 Completed BasementBasement family room |  Completed KitchenNew kitchen with paper stone countertop |
---|
RIGGS PARK NE NEW CONSTRUCTION (LEED PLATINIUM)
 DemolitionSalvage Existing Doors & Trim and Remove Plaster |  New FramingFraming for New Interior Layout |  Insulation of Hot Water LinesHot Water Lines are Insulated throughout the property |
---|
 Additional Structural SupportFraming to support Additional Load of Solar Panels |  Calk all PenetrationsAll Penetrations Calked to Reduce Air Infiltration |  Calk seams at JointsCalking at all Seams and Penetrations |
---|
 Exterior Insulation2" Exterior Insulation with Seams Taped |  Entry FoyerCustom Partition and Refinished Flooring |  Completed Dining RoomDining Room Open to Living Room & Kitchen |
---|
 Wine Rack at Kitchen CounterCustom Wine Rack at Kitchen Entry from Dining Room |  Completed KitchenExposed Brick, Custom Bamboo Counter, Refinished Doors and Reused Wood Flooring |  Master BedroomTwo Rear Bedrooms Converted in Master Suite |
---|
 Master BathroomMaster Tub with Bench and His & Hers Sinks |
---|
VARNUM STREET NW GUT REHAB (LEED PLATINUM)
 Front PorchRebuilt Front Porch |  Entry FoyerOpen Concept Design |  Refinish Existing FloorRefinished Existing Parquet Flooring |
---|
 Living RoomRoom with Wall Removed to Provide Open Space |  Custom Bamboo CounterNew Kitchen with Built-in Wine Rack and Custom Bamboo Counter |  Kitchen CounterCustom Built Counter Tops |
---|
 Custom CarpentryCustom Shelving and Counters |  Dining RoomDining Room with Custom Shelving & Cabinet Installed |  LibraryCustom Bamboo Shelving and Desk |
---|
 Powder RmBuilt-ins in Powder Room |  Main BathSecond Floor Shared Bathroom |  Master BedroomMaster Bedroom with Reused Hardwood Flooring |
---|
 Master BathNew Bathroom with Low Flow Toilet & Shower |  BasementOpen Concept Basement with Painted Concrete Floor |  Rear YardNew Rear Elevation and Stair |
---|
 BackyardBackyard with Garden Bed |  Heat Waste RecoveryHeat Waste Recovery Transfers Heat from the Waste Line to Incomeing Water Service |  E-Monitor InstallationInstallation of an Energy Monitoring System |
---|
4th STREET NW GUT REHAB (NET ZERO)
13th STREET NE (1st Renovation Project)
 Building Structural DamageCAT Consulting was retained to complete underpinning and Restore Building Structure |  Site DemolitionCrew Removing Damaged Metal Gate |  FoundationDamage to Existing Foundation |
---|
 Site WorkRemoval of Debris |  Site Work 2Crew Excavating Exterior to Create New Doorway |  Temporary BracingTemporary Structural Support |
---|
 Failed FoundationTemporary Structural Bracing to Support Building while New Foundation Installed |  ExcavationCrew Excavating Excess Dirt |  DemolitionCrew Removing Failed Foundation Wall |
---|
 FootingNew Footing Installation |  MasonryCrew installing New Foundation Wall |  New Foundation WallNew CMU Wall Being Installed |
---|
 Rebar & GravelReinforcement for Underpinning |  FoundationNew Foundation |  UnderpinningUnderpinning done in 4 Foot Sections |
---|
 Damage InspectionCrew inspecting Damaged Brick Structure |  New BrickworkMasons installing New Brickwork |  New Front ElevationRestored Brick Finish |
---|
7th STREET NW RESTORATION & UNDER PINNING
13th STREET NE GUT REHAB
 Pre Construction ElevationExisting property |  Rear ElevationPre-Construction Elevation |  Ground WorkInstallation of new sewer lines |
---|
 Basement SlabInstallation of Concrete Slab |  SlabConcrete Finishing |  Framing 1Basement Framing |
---|
 Framing 2Completed Interior Framing |  Framing 3Replacement of Front Exterior Wall |  Brick ElevationInstallation of Brick Facade |
---|
 Parking PadInstallation of rear Parking Pad |  FlooringInstallation of Hard Wood Flooring |  Kitchen 1 |
---|
 Kitchen 2 |  BathroomBasement Bath |  BedroomRear Bedroom |
---|
 SkylightSkylight above Stairwell |  EntryStair at Front Entry |  FrontNew Front Elevation |
---|
 RearNew Rear Elevation |
---|
13th STREET NE GUT REHAB