Site Clearing

Site Clearing

Removing all trees and bushes

Site Excavation

Site Excavation

Excavating for new footing

Foundation Wall Prep

Foundation Wall Prep

Installing rebar and laying out penetrations

Slab Prep with 2" Insulation

Slab Prep with 2" Insulation

2" Rigid insulation below new concrete slab

Framing with Electrical

Framing with Electrical

TJI framing and electrical rough-in

Mastic at all Duct Joints

Mastic at all Duct Joints

All duct joints are sealed with mastic

Ductwork & Sprinklers

Ductwork & Sprinklers

New duct-work, plumbing and sprinkler layout.

Plywood Seams Taped

Plywood Seams Taped

Air seal plywood joints with tape

Insulation at Windows

Insulation at Windows

Insulation between framing and window to reduce thermal bridging

Window Installation

Window Installation

Tape seal window exterior to reduce air leakage

Blown in Cellulose Insulation

Blown in Cellulose Insulation

Insulating all exterior walls and ridge beams

Finishing Drywall

Finishing Drywall

Crew tape and mud all drywall seams

Exterior Insulation

Exterior Insulation

2" of exterior rigid insulation

Siding Installation

Siding Installation

Crew installing hardi-board siding

Rear Elevation During Construction

Rear Elevation During Construction

View of siding installation in progress

Testing of Bathroom Fans

Testing of Bathroom Fans

Consultant checking the efficiency of bath fan

Blower Door Testing

Blower Door Testing

Consulting checking the buildings' volume of air leakage

Completed Bedroom

Completed Bedroom

View of completed bedroom

Completed Basement

Completed Basement

Basement family room

Completed Kitchen

Completed Kitchen

New kitchen with paper stone countertop

RIGGS PARK NE NEW CONSTRUCTION (LEED PLATINIUM)

Demolition

Demolition

Salvage Existing Doors & Trim and Remove Plaster

New Framing

New Framing

Framing for New Interior Layout

Insulation of Hot Water Lines

Insulation of Hot Water Lines

Hot Water Lines are Insulated throughout the property

Additional Structural Support

Additional Structural Support

Framing to support Additional Load of Solar Panels

Calk all Penetrations

Calk all Penetrations

All Penetrations Calked to Reduce Air Infiltration

Calk seams at Joints

Calk seams at Joints

Calking at all Seams and Penetrations

Exterior Insulation

Exterior Insulation

2" Exterior Insulation with Seams Taped

Entry Foyer

Entry Foyer

Custom Partition and Refinished Flooring

Completed Dining Room

Completed Dining Room

Dining Room Open to Living Room & Kitchen

Wine Rack at Kitchen Counter

Wine Rack at Kitchen Counter

Custom Wine Rack at Kitchen Entry from Dining Room

Completed Kitchen

Completed Kitchen

Exposed Brick, Custom Bamboo Counter, Refinished Doors and Reused Wood Flooring

Master Bedroom

Master Bedroom

Two Rear Bedrooms Converted in Master Suite

Master Bathroom

Master Bathroom

Master Tub with Bench and His & Hers Sinks

VARNUM STREET NW GUT REHAB (LEED PLATINUM)

Front Porch

Front Porch

Rebuilt Front Porch

Entry Foyer

Entry Foyer

Open Concept Design

Refinish Existing Floor

Refinish Existing Floor

Refinished Existing Parquet Flooring

Living Room

Living Room

Room with Wall Removed to Provide Open Space

Custom Bamboo Counter

Custom Bamboo Counter

New Kitchen with Built-in Wine Rack and Custom Bamboo Counter

Kitchen Counter

Kitchen Counter

Custom Built Counter Tops

Custom Carpentry

Custom Carpentry

Custom Shelving and Counters

Dining Room

Dining Room

Dining Room with Custom Shelving & Cabinet Installed

Library

Library

Custom Bamboo Shelving and Desk

Powder Rm

Powder Rm

Built-ins in Powder Room

Main Bath

Main Bath

Second Floor Shared Bathroom

Master Bedroom

Master Bedroom

Master Bedroom with Reused Hardwood Flooring

Master Bath

Master Bath

New Bathroom with Low Flow Toilet & Shower

Basement

Basement

Open Concept Basement with Painted Concrete Floor

Rear Yard

Rear Yard

New Rear Elevation and Stair

Backyard

Backyard

Backyard with Garden Bed

Heat Waste Recovery

Heat Waste Recovery

Heat Waste Recovery Transfers Heat from the Waste Line to Incomeing Water Service

E-Monitor Installation

E-Monitor Installation

Installation of an Energy Monitoring System

4th STREET NW GUT REHAB (NET ZERO)

13th STREET NE (1st Renovation Project)

Building Structural Damage

Building Structural Damage

CAT Consulting was retained to complete underpinning and Restore Building Structure

Site Demolition

Site Demolition

Crew Removing Damaged Metal Gate

Foundation

Foundation

Damage to Existing Foundation

Site Work

Site Work

Removal of Debris

Site Work 2

Site Work 2

Crew Excavating Exterior to Create New Doorway

Temporary Bracing

Temporary Bracing

Temporary Structural Support

Failed Foundation

Failed Foundation

Temporary Structural Bracing to Support Building while New Foundation Installed

Excavation

Excavation

Crew Excavating Excess Dirt

Demolition

Demolition

Crew Removing Failed Foundation Wall

Footing

Footing

New Footing Installation

Masonry

Masonry

Crew installing New Foundation Wall

New Foundation Wall

New Foundation Wall

New CMU Wall Being Installed

Rebar & Gravel

Rebar & Gravel

Reinforcement for Underpinning

Foundation

Foundation

New Foundation

Underpinning

Underpinning

Underpinning done in 4 Foot Sections

Damage Inspection

Damage Inspection

Crew inspecting Damaged Brick Structure

New Brickwork

New Brickwork

Masons installing New Brickwork

New Front Elevation

New Front Elevation

Restored Brick Finish

7th STREET NW RESTORATION & UNDER PINNING

13th STREET NE GUT REHAB

Pre Construction Elevation

Pre Construction Elevation

Existing property

Rear Elevation

Rear Elevation

Pre-Construction Elevation

Ground Work

Ground Work

Installation of new sewer lines

Basement Slab

Basement Slab

Installation of Concrete Slab

Slab

Slab

Concrete Finishing

Framing 1

Framing 1

Basement Framing

Framing 2

Framing 2

Completed Interior Framing

Framing 3

Framing 3

Replacement of Front Exterior Wall

Brick Elevation

Brick Elevation

Installation of Brick Facade

Parking Pad

Parking Pad

Installation of rear Parking Pad

Flooring

Flooring

Installation of Hard Wood Flooring

Kitchen 1

Kitchen 1

Kitchen 2

Kitchen 2

Bathroom

Bathroom

Basement Bath

Bedroom

Bedroom

Rear Bedroom

Skylight

Skylight

Skylight above Stairwell

Entry

Entry

Stair at Front Entry

Front

Front

New Front Elevation

Rear

Rear

New Rear Elevation