CAT Consulting Service, LLC
Building Green Living
Top Producer of LEED Platinum Homes in DC
Site ClearingRemoving all trees and bushes | Site ExcavationExcavating for new footing | Foundation Wall PrepInstalling rebar and laying out penetrations |
---|---|---|
Slab Prep with 2" Insulation2" Rigid insulation below new concrete slab | Framing with ElectricalTJI framing and electrical rough-in | Mastic at all Duct JointsAll duct joints are sealed with mastic |
Ductwork & SprinklersNew duct-work, plumbing and sprinkler layout. | Plywood Seams TapedAir seal plywood joints with tape | Insulation at WindowsInsulation between framing and window to reduce thermal bridging |
Window InstallationTape seal window exterior to reduce air leakage | Blown in Cellulose InsulationInsulating all exterior walls and ridge beams | Finishing DrywallCrew tape and mud all drywall seams |
Exterior Insulation2" of exterior rigid insulation | Siding InstallationCrew installing hardi-board siding | Rear Elevation During ConstructionView of siding installation in progress |
Testing of Bathroom FansConsultant checking the efficiency of bath fan | Blower Door TestingConsulting checking the buildings' volume of air leakage | Completed BedroomView of completed bedroom |
Completed BasementBasement family room | Completed KitchenNew kitchen with paper stone countertop |
RIGGS PARK NE NEW CONSTRUCTION (LEED PLATINIUM)
DemolitionSalvage Existing Doors & Trim and Remove Plaster | New FramingFraming for New Interior Layout | Insulation of Hot Water LinesHot Water Lines are Insulated throughout the property |
---|---|---|
Additional Structural SupportFraming to support Additional Load of Solar Panels | Calk all PenetrationsAll Penetrations Calked to Reduce Air Infiltration | Calk seams at JointsCalking at all Seams and Penetrations |
Exterior Insulation2" Exterior Insulation with Seams Taped | Entry FoyerCustom Partition and Refinished Flooring | Completed Dining RoomDining Room Open to Living Room & Kitchen |
Wine Rack at Kitchen CounterCustom Wine Rack at Kitchen Entry from Dining Room | Completed KitchenExposed Brick, Custom Bamboo Counter, Refinished Doors and Reused Wood Flooring | Master BedroomTwo Rear Bedrooms Converted in Master Suite |
Master BathroomMaster Tub with Bench and His & Hers Sinks |
VARNUM STREET NW GUT REHAB (LEED PLATINUM)
Front PorchRebuilt Front Porch | Entry FoyerOpen Concept Design | Refinish Existing FloorRefinished Existing Parquet Flooring |
---|---|---|
Living RoomRoom with Wall Removed to Provide Open Space | Custom Bamboo CounterNew Kitchen with Built-in Wine Rack and Custom Bamboo Counter | Kitchen CounterCustom Built Counter Tops |
Custom CarpentryCustom Shelving and Counters | Dining RoomDining Room with Custom Shelving & Cabinet Installed | LibraryCustom Bamboo Shelving and Desk |
Powder RmBuilt-ins in Powder Room | Main BathSecond Floor Shared Bathroom | Master BedroomMaster Bedroom with Reused Hardwood Flooring |
Master BathNew Bathroom with Low Flow Toilet & Shower | BasementOpen Concept Basement with Painted Concrete Floor | Rear YardNew Rear Elevation and Stair |
BackyardBackyard with Garden Bed | Heat Waste RecoveryHeat Waste Recovery Transfers Heat from the Waste Line to Incomeing Water Service | E-Monitor InstallationInstallation of an Energy Monitoring System |
4th STREET NW GUT REHAB (NET ZERO)
13th STREET NE (1st Renovation Project)
Building Structural DamageCAT Consulting was retained to complete underpinning and Restore Building Structure | Site DemolitionCrew Removing Damaged Metal Gate | FoundationDamage to Existing Foundation |
---|---|---|
Site WorkRemoval of Debris | Site Work 2Crew Excavating Exterior to Create New Doorway | Temporary BracingTemporary Structural Support |
Failed FoundationTemporary Structural Bracing to Support Building while New Foundation Installed | ExcavationCrew Excavating Excess Dirt | DemolitionCrew Removing Failed Foundation Wall |
FootingNew Footing Installation | MasonryCrew installing New Foundation Wall | New Foundation WallNew CMU Wall Being Installed |
Rebar & GravelReinforcement for Underpinning | FoundationNew Foundation | UnderpinningUnderpinning done in 4 Foot Sections |
Damage InspectionCrew inspecting Damaged Brick Structure | New BrickworkMasons installing New Brickwork | New Front ElevationRestored Brick Finish |
7th STREET NW RESTORATION & UNDER PINNING
13th STREET NE GUT REHAB
Pre Construction ElevationExisting property | Rear ElevationPre-Construction Elevation | Ground WorkInstallation of new sewer lines |
---|---|---|
Basement SlabInstallation of Concrete Slab | SlabConcrete Finishing | Framing 1Basement Framing |
Framing 2Completed Interior Framing | Framing 3Replacement of Front Exterior Wall | Brick ElevationInstallation of Brick Facade |
Parking PadInstallation of rear Parking Pad | FlooringInstallation of Hard Wood Flooring | Kitchen 1 |
Kitchen 2 | BathroomBasement Bath | BedroomRear Bedroom |
SkylightSkylight above Stairwell | EntryStair at Front Entry | FrontNew Front Elevation |
RearNew Rear Elevation |
13th STREET NE GUT REHAB